Every project below was scoped, supplied, installed, or sustained by Cosmos engineers — across refinery turnarounds, petrochemical commissionings, steam audits, and surface-protection campaigns from Sarawak to Melaka.
How we delivered
180 valves in 14 weeks
Major hydroprocessing refinery planning a 21-day turnaround needed 180 sleeve plug and high-performance butterfly valves replaced across utilities and process — fully certified, with sour-service materials on critical isolation, and zero room for slippage in the schedule.
Cosmos engineers ran a 3-day walkdown to verify line specs, then issued a single engineering proposal with OEM-direct supply from Crane / XOMOX. Pre-staging at the plant warehouse began 4 weeks ahead of shutdown so field crews could install on Day 1 of the turnaround window.
All 180 valves delivered, installed, and commissioned within the 14-week window. Zero punch items related to Cosmos scope at handover. Refinery returned to full production three days ahead of the original turnaround schedule.
The full ledger
Refinery Turnaround Valve Supply
Steam System Optimization
Chemical Plant Lining Project
Offshore Platform Valve Refurbishment
Petrochemical Facility Commissioning
Boiler Feedwater System Upgrade
FRP Stack Installation
Acoustic Silencer Retrofit
Static Mixer Installation Programme
PTA Plant Valve Audit
Sour Service Valve Replacement
Cooling Water Tank Lining
Active across
the Peninsula
Project sites from Bintulu in the east to Lumut in the west — coordinated from our Kuantan workshop with regional field crews on call.

Ready to spec us
into your next project?
From RFQ to installation, our engineering team is ready to help you maximize plant integrity and uptime.